Hospital, AHU 18 Refurbishment
ALL CASE STUDIES

Hospital, AHU 18 Refurbishment

LOCATION

North West

INDUSTRY

Healthcare

OUTCOMES

HTM 03-01 verified

Required airflow achieved

Critical AHU returned to operation

An in-situ refurbishment of a critical supply and extract air handling unit at a North West hospital, combining complex access and lifting, mechanical upgrades, fan and DX replacement, and full system verification in a live healthcare environment.

Challenge

AHU 18 was too large to remove from the plantroom as a complete unit, so the refurbishment had to be delivered in-situ. The works combined restricted access, heavy component handling and an existing membrane roof, with airside modifications and live building services carried out in a critical healthcare environment.

Solution

Emtec coordinated the enabling and mechanical works for the full supply and extract AHU upgrade. This included a dedicated access and crane-lifting strategy, relocation of fire, electrical and steam/condensate services, new fresh-air ductwork and a frost coil section, replacement of the existing belt-driven supply and extract fans with direct-drive plug fans, and a DX heating and cooling upgrade using four Mitsubishi Heavy systems. The works were completed alongside the incumbent BMS and controls provider before the AHU was re-energised, set to work and verified.

Result

AHU 18 was returned to full operation with new plug fans, DX systems and frost coil modifications. Supply and extract fan speeds were set to achieve the required airflow volumes, and a full system verification was completed in line with HTM 03-01.

Get in touch

To talk to us about a new system, an existing one, a planned project or a critical issue, please get in touch.

24/7 emergency number:
01925 595 295
PLEASE SEND US AN ENQUIRY
PLEASE SEND US AN ENQUIRY
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.