Data Centre CRAC & Chilled Water Replacement
ALL CASE STUDIES

Data Centre CRAC & Chilled Water Replacement

LOCATION

London

INDUSTRY

Data centres

OUTCOMES

Cooling resilience maintained

4 live data halls

Live chilled-water integration

A phased critical-cooling replacement programme delivered within a fully operational London colocation data centre, replacing 13 DX CRAC systems, 26 associated rooftop condenser circuits and 5 chilled-water units across four live data halls while maintaining cooling resilience throughout the works.

Challenge

The client required ageing critical cooling equipment to be replaced across four occupied data halls without compromising resilience to the live server environment. Site access was extremely restricted, and the works had to be planned around a fully operational building, including rooftop lifting operations and the movement of replacement plant through the building via the passenger lift.

Solution

Emtec Climate Solutions delivered the replacement programme in carefully controlled phases. The works included decommissioning, refrigerant recovery and replacement of 13 DX CRAC systems, installation of 26 associated rooftop condensers/circuits via a planned crane lift, and replacement of 5 chilled-water units with new Stulz ASD 940CW equipment. Refrigerant and chilled-water pipework was modified as required, with new condensate pumps and leak detection installed. Emtec also completed a controlled live connection into the existing chilled-water system, allowing the new cooling equipment to be integrated without shutting down the existing system. Systems were pressure tested, evacuated, charged and prepared for final manufacturer commissioning.

Result

The multi-system critical cooling replacement was delivered through a controlled phased programme across four operational data halls. Cooling resilience was maintained throughout the works, including during the live chilled-water modification, and the new DX and chilled-water equipment was integrated into the existing critical cooling infrastructure without requiring a shutdown of the existing chilled-water system.

Get in touch

To talk to us about a new system, an existing one, a planned project or a critical issue, please get in touch.

24/7 emergency number:
01925 595 295
PLEASE SEND US AN ENQUIRY
PLEASE SEND US AN ENQUIRY
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.